Tel: 01525 864387

Bedford Cemetery

Following on issues of flooding in the extension area of the Bedford Norse Road Cemetery CDS drainage team headed by Alex Vickers designed a solution to the surface water problem.

CDS were responsible for design and specifications documentation and undertook the tender process on behalf of the client.

The drainage involves a series of laterals and these are interconnected through perpendicular rotary slitting.

Cemetery flooding is a problem and the CDS team of expert engineers will help councils reduce the stress and complaints associated with this perennial problem.